Pearl white ceramic particles
2021/03/17 15:36:03
Implementation conditions:
1. Construction of adhesive layer: The adhesive layer is located between each asphalt oil surface layer, and the working surface is required to be dry. The adhesive layer oil is generally prepared by mixing quick cracking emulsifiers with asphalt and water, and the concentration is relatively thin. Pay attention to cleaning pollutants during construction on sunny days, and ensure that the work surface is not damp after rainy days.
2. Construction of asphalt concrete surface layer: The surface layer construction should be carried out within 24 hours after the construction of the prime coat and seal coat, to avoid the prime coat and seal coat from being soaked by sudden rainwater and causing construction delays. The middle and upper layers should be constructed immediately after the application of the adhesive layer oil.
3. Rainy season construction conditions: During the rainy season, construction should avoid unfavorable weather conditions such as rain, low temperatures, and strong winds. Construction can only be carried out when the working surface on site is dry.
Colored road surfaces have characteristics such as vivid colors and stable chemical properties. At present, there are several color schemes including red, green, yellow, etc., and color design can be carried out according to customer requirements.